Tag Archives: lab machine

in Baltimore United States sales price shop near me near me shop factory supplier Small Calender Machine for Lab Use Small Calender Mill manufacturer best Cost Custom Cheap wholesaler

  in Baltimore United States  sales   price   shop   near me   near me shop   factory   supplier Small Calender Machine for Lab Use Small Calender Mill manufacturer   best   Cost   Custom   Cheap   wholesaler

EPG has been efficiently certified by ISO9002 Top quality Administration System, ISO9001 High quality Management System, API certificate, ISO/TS16949:2002 and ISO10012 measurement administration system. Thanks to our sincerity in providing greatest services to our customers, understanding of your needs and overriding perception of accountability toward filling ordering demands, Possessing gathered precious expertise in cooperating with international buyers, modest calenEPTTEPTT for lab use/small calenEPTTmill

EPTTngdao EPTT EPTT Sector EPTT, Ltd.make large good quality rubber EPTT, from resources to producing, we use the excellent high quality substance, total administration technique, also excellent aftersale provider, we hope to be one particular trustworthy factory for you!

one. Application
EPTizing and fractioning of textile materials, rubberizing of wirecord fabric, sheet, and counter plate(embossed) of rubber substance, separation of cloth and movie, as effectively as joint of multi-layer laminate movie.

two. EPTT style:

It mostly contains roller, rack, backplane, adjustment, device, EPTT technique, roller temperature management gadget, protection gadget, lubricating system, and many others.

3. Functions:

The roller is made of chilled solid iron alloys, whose operate area has large hardness, use-resistent and durable daily life. Steam, cooling drinking water, and heat-conducting oil can go into the rollers cavity, so that the working temperature can be altered in orEPTTto meet the technological requirements.

Roll spacing can be adjusted both by guide or electric manner.

Roller bearings lubricating can undertake drier oil or dilute oil.

Primary motor EPTT .75KW*2
EPT appliable: LDPEEPTTPEPPPSABSPC
Merchandise thickness .2-2mm
Item width -80mm
Roll quantity 3
Diameter of roll 120mm
Length of roll 250mm
nip assortment -5mm(adjustable)
linear velocity .5-19m/min(stepless adjustment)
Pull roll velocity: .5-20m/min(stepless adjustment)
Max. Roll Temperature. 180
All round dimensions:(L timesW timesH) 825 times700 times1400mm
Security stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd: CE certification
Unexpected emergency stop: Presss botton and pull rope
Notice: LWM ampwater chilled chooseable

FQA-Problems of client problem:
About EPTT overall performance good quality
one. Q: How to assure the good quality of outsourcing elements?
A: Very first choice far more than 4 suppler by tender, There are stringent system and approach for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, certified items, labeling and storage. Not competent, return.
two. Q: Which model of electric powered part?
A: Use entire world well-known brand names, EPT, Omron, Toshiba, Schneider, ABB Consumer can specify the manufacturer.
three. Q: Which PLC:
A: EPT, Omron, EPT
four. Q: How to management the high quality?
A: There are inspectors for inspecting gear quality and overall performance, right after a ssembly, EPTT operate continuously for at lEPT twelve hours at one particular time, Whole running time should be not much less than 48 several hours.
About set up
1. Q: When the XiHu (West EPT) Dis.Hu (West EPT) Dis. engineer arrive at customer’s manufacturing unit?
A: If require set up on web site, engineer will get there at manufacturing unit within 1 7 days after EPTT arrived at factory.
About right after-sales provider
1. Q: What is the warranty time?
A: 5 several years after EPTT arrived at manufacturing unit
two. Q: How to resolve the dilemma?
A: Inside of half an hour following receiving customer’ difficulty, notify the remedy way, there are three waEPTTfor different situations. 1, Which can be solved by mobile phone or E-mail, it will be solved in two several hours. two. Which can be solved by Remote EPTT, it will be solved inside four hrs(EPTT is equipped by Distant Community EPTT Difficulty). 3. Which need to have fix it on site, engineer arrive at factory inside one week(in the two several years guarantee day, engineer has the visa any time of the country exactly where the EPTT.

  in Baltimore United States  sales   price   shop   near me   near me shop   factory   supplier Small Calender Machine for Lab Use Small Calender Mill manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Baltimore United States  sales   price   shop   near me   near me shop   factory   supplier Small Calender Machine for Lab Use Small Calender Mill manufacturer   best   Cost   Custom   Cheap   wholesaler